Case Study: Roof Replacement and Spray Foam Removal – 130m²

Project Overview

Our team was commissioned to remove approximately 130m² of rigid closed-cell spray foam insulation that had been applied directly to the roofing membrane and structure. Following the removal, we carried out a full roof replacement to restore structural integrity, improve ventilation, and bring the property in line with building regulations. The project also included a loft insulation upgrade, ensuring compliance with current energy efficiency standards.

Scope of Work

Scaffolding and Site Preparation


Roof Strip and Spray Foam Removal


New Roof Installation


Insulation Upgrade


Final Preparations and Clean-up

Challenges and Solutions

Rigid Spray Foam Removal

The removal of rigid closed-cell spray foam, adhered directly to the membrane, required controlled techniques to protect the roof timbers. Our team successfully achieved complete removal while safeguarding the structural elements of the roof.

Leadwork Inspection
As with many roof replacements, leadwork could not be fully assessed until the strip-out stage. We highlighted this contingency to the client in advance and addressed any issues promptly once identified.

Conclusion

This project was delivered on time and to a high professional standard. The roof now benefits from a breathable membrane system, improved ventilation, and upgraded insulation. With all certifications and guarantees in place, the property is fully compliant, mortgageable, and prepared for long-term performance.

Key Benefits to the Client:

  • Structural Protection: Full removal of rigid spray foam safeguarded the roof timbers.
  • Improved Efficiency: Loft insulation upgraded to 300mm, reducing heat loss and energy costs.
  • Compliance & Assurance: Client received LABC completion certificate, mortgage approval certificate, and a 10-year insurance-backed guarantee.
  • Future Marketability: Removal of spray foam ensures the property can be sold or remortgaged without restrictions.
  • Client Testimonial:

    The client expressed satisfaction with the high level of professionalism and attention to detail, particularly appreciating the seamless coordination with building control and the careful treatment of the timber structure.